LPD Builders

For lenders · LPD Builders · CSLB Lic. #1082065

A builder's check on the construction budget.

Construction and bridge lenders use a second set of eyes on a borrower’s budget. We walk the property and price the scope line by line, so you know whether the number holds before you fund it.

Send us a budget to reviewCall or text (415) 299-5369

What you get

Will the budget hold to completion?

Contractor cost review

The borrower’s budget checked against what the work will actually cost, line by line.

Scope and code exposure

Permit-triggered seismic, sprinkler, life-safety and ADA items identified up front.

Schedule reality check

Long-lead items, permitting time and sequencing reviewed against the draw schedule.

Plain written findings

What holds, what doesn’t, and why, in a format your credit team can use.

Review the budget. Price what’s left. Verify each draw.

01

Budget review

We reply within one business day, walk the property and test the borrower’s budget line by line. Target: written findings in 7 calendar days of the walk and the information we need.

02

Cost to complete

What remains, priced line by line against what has been spent, so you know whether the loan still covers the work.

03

Draw and progress verification

Site visits before each draw to confirm the work billed is in place, with photos and a short written report for your file.

If LPD is also bidding or building the work, we tell you in writing before the review begins.

Proof

Budgets tested line by line.

Finished second-floor suite at Brannan St

Commercial TI · SoMa, San Francisco

Brannan St

A second-floor suite. Base-building work priced as separate options, allowances carried with unused funds credited back, structural special inspections and final inspection passed.

Multi-tenant commercial · San Mateo

S Amphlett Blvd

A multi-tenant building brought back to code: storefront windows, glass office doors, sprinklers and ADA parking. This is the permit-triggered scope a borrower’s budget can leave out.

See the full project list →

Questions

Questions from credit and asset teams.

What if you also bid or build the project?

We tell you up front. If we are bidding or building the project, you know before we start, and you decide whether to use our review.

What do we receive?

A written report: what holds, what doesn’t and why, line by line, with code exposure and schedule risk checked against your draw schedule.

How fast can you turn it around?

We reply within one business day. Target: written findings in 7 calendar days of the walk and the information we need.

LPD Builders, CSLB Lic. #1082065

Check the budget before you fund it.

PROJECTS AND PARTNERS

[email protected]

OFFICE

68 Mitchell Blvd, Suite 215
San Rafael, CA 94903

LICENSE

Lombardi Property Development, LLC (LPD Builders) · Licensed California general contractor, CSLB #1082065, Class B General Building. W-9 available on request.
Verify our license → · Privacy

Prices are estimates based on the scope, plans and site conditions available at the time. An estimate is not a bid or contract; pricing becomes binding only in a signed agreement. The 7-Day Price starts after our site walk and receipt of the information we request. Timelines are targets, not guarantees. Lombardi Property Development, LLC (LPD Builders), CSLB #1082065.

LPD Builders is the brand of Lombardi Property Development, LLC. CSLB #1082065. Serving San Francisco, San Mateo, Santa Clara, Marin, Alameda, Contra Costa, Solano, Sonoma and Napa counties.